| In Hemaraj ESIE, ESIE and Hemaraj CIE | |
Water Supply |
|
| Treatment Capacity of 500 cu.m. per day (Full Phase) Average supply of 2 cu.m. per rai per day on average. |
|
| Waste Water Treatment | |
| Package Activated Sludge capacity 400 cu.m. per day.(Full Phase) | |
| Communication Access | |
| Telephone lines, ISDN local Service, International ISDN, data communication leased line and ISP shall available from CAT (CAT Telecom Public Company Limited) or TRUE (True Corporation Public Company Limited) | |
| Mobile Phone | |
| Digital 1800 MHz, GSM and CDMA | |
| Road System | |
| Main Road 40 meters width, 2 lanes, Reinforced Concrete. Primary Road 22 meters width, 2 lanes, Reinforced Concrete. |
|
| Flood Control System | |
| Reinforced concrete drainage pipe with manhole. | |
| In Hemaraj RIL | |
| Water Supply | |
| 15,000 Cu.m. per day (expandable) | |
| Water Treatment Capacity | |
| 12,000 Cu.m. per day (expandable) | |
| Waste Water Treatment System | |
| 16,000 Cu.m. per day (expandable) Retention Pond of 80,000 Cu.m. |
|
| Electricity Supply | |
| 115kV/22kV 3 x 50 MVA Internal substation of PEA Small Power Producer (SPP) of Gulf with capacity 120 MVA |
|
| Telephone Access | |
| Land lines, mobile telephone networks, ISDN and fibre optic | |
| Road System | |
| Main Road | |
| 40 meters width, 4 lanes, reinforced concrete based on Highway Department Standard | |
| Secondary Road | |
| 30 meters width, 2 lanes, reinforced concrete based on Highway Department Standard | |
| Flood Control System | |
| U-ditch drainage system | |
| Soil Condition | |
| Strong ground load bearing capacity Solid Soil, 5-8 meter pile depth average |
|
| Natural and Industrial Gases | |
Natural gas from PTT Public Company Limited (PTT) to customers in Hemaraj RIL through an underground pipe system. |
|
| In Hemaraj SIL | |
Water Supply |
|
Pulsator and sand filter system |
|
| Water Resource | |
| Rapeepatra Irrigation Canal from Prasak Cholasith Dam of 785 Million Cu.m. Raw Water Reservoir of 320,000 Cu.m. |
|
| Raw Water | |
| 60,000 Cu.m. per day (expandable) | |
| Water Treatment Capacity | |
| 15,000 Cu.m. per day (expandable) Computer control system and quality meter real time 24 hours |
|
| Waste Water Treatment System | |
| 10,000 Cu.m. per day (expandable) Retention Pond of 330,000 Cu.m. |
|
| Electricity Supply | |
| 115kV/22kV 2 x 50 MVA Internal substation of PEA Small Power Producer (SPP) namely Nong Khae Co-generation (NKCC) of Gulf with capacity 120 MVA |
|
| Telephone Access | |
| Land lines, mobile telephone networks, ISDN and fiber optic | |
| Road System | |
Main Road Secondary Road |
|
| Flood Control System | |
| Surrounded by a 2-meter-high earth dike U-ditch drainage system |
|
| Soil Condition | |
Strong ground load bearing capacity |
|
| Natural and Industrial Gases | |
| Natural gas from PTT Public Company Limited (PTT) to customers in Hemaraj SIL through an underground pipe system Industrial gases (Oxygen, Nitrogen, Hydrogen, Argon) from Air Liquid in Hemaraj SIL to customers by tube or through a pipe system. |
|
|
|